• Home
    • Site Map
  • Services
    • Storm Water Compliance/ Erosion Control
    • Pond Construction/ Liners
    • Polymer Stabilized Road Surfaces
    • Vegetation Management
    • Land Restoration
    • Rain Water Harvesting
    • Slope Stabillization
    • Dust Control
    • Vactor Truck Service
    • Low Impact Landscape
  • About Us
    • Credentials
    • Management
    • Resources
  • SWPPP
    • SWPPP Design - Construction
    • SWPPP Design - Industrial
    • Beth Smiley, CPESC, CPSWQ Consulting Services
    • Register for a Training Seminar
    • Past Seminars
    • Water Treatment
  • Projects
    • List of Projects
      • Advanced Treatment
      • Dust Control on Unpaved Roads
      • Pond Construction and Liners
      • Restoration Projects
      • SWPPP Design
    • Case Histories
    • Project Photo Gallery
  • Contact Us

 

Thunder Mounaint Home
site maperosion control blanket installation
 


Erosion Control Blanket Installation

Project Summary:


Thunder Mountain Enterprises, Inc.
was contracted to install 5000sf of Turf Reinforcement Matt (TRM) to control slope erosion on a 0.5:1 slope. Caltrans major objective was to stop the sediment flow from the erosion to a Drain Inlet 25 yards from the toe of the slope. In 17 days Thunder Mountain Enterprises, Inc. prepared, hydroseeded and installed the Turf Reinforcement Mat to the slope with complete satisfaction of CalTrans project manager.

 

Project Details:


Customer: CalTrans - District 10
Location: Calaveras County
Dollar Amount: 41,000
Project Manager: Leo Richert
Letter from Project Manager: click here (23KB, )
Materials Manufacture Outline: click here (227KB, )

 

 

 

Copyright © 2006 Thunder Mountain Enterprises, Inc. (TME). All rights reserved.
P.O. Box 292821, Sacramento, CA 95829 telephone: (916) 381-3400